Brunsbuettel – Kiel Canal Locks |
The German Waterways Authorities have announced that the large locks at the western end of the Kiel Canal in Brunsbuettel have to be repaired and will be out of service for a period of 2 to 3 weeks.
The effect of the lock repair will cause any vessels that has a length of more than 125m not to be able to enter or exit the canal.